Construction of Irrigation and Water Works – Sector 1: 1023ha and Pumping Station (PS-1), has (3 + 1) centrifugal pumps with a water capacity of 2.01 m3/s and the main canal of length = 5,020 meter with 6 branches of total length 7,277 meters. – Sector 2: 1232ha and Pumping Station (PS-2), has (4 + 1) centrifugal pumps with a water capacity of 2.68 m3/s and the main canal of length = 5,913 meter with 6 branches of total length 7,512 meters. Employer: Sierra Leone Regional Rice Value Chain Project, Ministry of Agriculture and Food Security (MAFS). Funded by : (IsDB) Islamic Development Bank




Comments are closed