Stay updated with the latest news, project highlights, and industry insights.

FOLLOW US ON:

Get in touch!

Have a question or need assistance? Reach out to us today, and our team will be happy to help with your inquiries or project needs.

6A Madongo Town, Congo Cross Freetown

Latest News

Pavi Fort Company Registration – Ghana

We are pleased to share our official Company Registration Certificate in the Republic of Ghana.

Read More

PAVI FORT Company Officially Expands Operations to Saudi Arabia

We are proud to announce that PAVI FORT Company for General Contracting has officially obtained its Commercial Registration (CR) in the Kingdom of Saudi Arabia. This marks a significant milestone in our growth and commitment to serving clients across the region. About the Registration Scope of

Read More

Upgrading of 467 km of Main Roads in Liberia

Description:This proposal focuses on the upgrading of approximately 467 km of primary road corridors across five counties in Liberia, divided into seven lots and two packages. The project aims to enhance regional connectivity, reduce transportation costs, and stimulate economic growth by linking Monrovia with key districts

Read More

Development of 264 Ha lowland for Pump irrigation Agriculture in Malikun- da and Sambang lowlands – The Gambia—lot 3

Land development for irrigation, work entails construction of canals and dykes, Pumping stations and other facilities for irrigation agriculture Employer: The Government of the Gambia Funded by: (IsDB) Islamic Development Bank

Read More

Project for the Construction of 50km of Urban roads in Banjul, The Gambia Lot II

Construction of some 27.8km of hot asphalt mixed concrete road with 2 lane carriage, with paved shoulder and side walk s, parking spaces including street light and drainages Employer : Ministry of works, Transportation and infrastructure National Road Authority (NRA) – Funded by: OIC for the

Read More

Construction of the Agricultural Irrigation Infrastructure, and Water Facilities under the Regional Rice Value Chain in Torma Bum Bonthe District – Sierra Leone

Construction of Irrigation and Water Works – Sector 1: 1023ha and Pumping Station (PS-1), has (3 + 1) centrifugal pumps with a water capacity of 2.01 m3/s and the main canal of length = 5,020 meter with 6 branches of total length 7,277 meters. – Sector

Read More

Rehabilitation Construction of 35km Rural Roads in Bum Chiefdom Bonthe District, Sierra Leone

The road package are two parts Part 1: the main road at west of the site and parallel to Sewa River and has a length of 17,000m. Part 2: Five settlement roads of total length 15,730m. Employer: Sierra Leone Regional Rice Value Chain Project) Funded by

Read More

Key Considerations for Real Estate Development Projects

Introduction: Real estate development is a complex process that requires careful planning, strategy, and execution. Developers must consider multiple factors to ensure a successful outcome. Takeaway: By carefully considering these factors, developers can ensure their projects are well-planned and financially viable, reducing risks and maximizing returns.

Read More

The Benefits of Using Modern Construction Equipment

Introduction: The evolution of construction equipment has revolutionized the way projects are executed. From automation to enhanced safety, modern equipment brings numerous benefits to the construction site. Takeaway: Investing in modern construction equipment not only boosts project efficiency but also ensures a safer, more cost-effective, and

Read More